Madeira · construction diary

The site,
month by month

No renders on this page. These are photos and video stills from the building site on Madeira, taken by the developer and published as the work moves on. Building started in August 2026; keys are planned for May 2027.

Last update: 8 October 2026

01

Stage one · the ground

August 2026

The plot is cleared and the old wall along the road comes down. The excavator opens the ground for the garage level, the base for the tower crane is cast, and then the crane goes up over the plot.

The plot at the start, hills behind
The old wall along the road is taken down
Excavator and truck by the old wall
The first cut into the ground
The pit for the garage level
Formwork for the first retaining wall against the slope
Concrete base for the tower crane
Stone from the dig
The crane goes up
Tower crane over the plot
Crane and excavator at work together

02

Stage two · foundation and garage level

September 2026

Retaining walls are cast against the slope. The foundation slab is reinforced bar by bar and poured with a concrete pump. On top of it rise the walls of the garage level, and by mid-September the slab over the garage is cast.

Pouring the foundation slab: pump boom and tower crane
Concrete for the retaining wall along the road
Retaining walls hold the slope
Reinforcement for the foundation slab
The foundation slab being poured
Formwork for the walls of the garage level
Walls of the garage level going up
The slab over the garage level is cast
Concrete walls of the garage level

03

Stage three · now

October 2026

The garage level is closed and waterproofed. On its slab the first columns of the apartment floors are rising: reinforcement is tied, formwork panels go up, the crane feeds them. Photos of 7 October.

7 October: the first columns above the garage slab
Formwork panels for the columns
Column reinforcement tied on the slab
Along the road, the bay behind
From the road: the garage wall and the crane
The crane over the site
On top of the garage level
Shaft for the lift
Waterproofed wall, rock fill behind it
The site today, the hills behind